Sunday, May 3, 2020

JCT Standard Building for Scottish Construction-myassignmenthelp

Question: Discuss about theJCT Standard Building for Scottish Construction. Answer: The duties of the architect under the JCT Standard Building Contract with Quantities 2016 On the JCT, the architect is named under clause 2.4, and has been treated traditionally as the main leader who co trolls the design team. Both the employer and the architect are able o enter into the agreement through the signing of the RIBAs SFA. This form is able to highlight the different duties which the architect will be able to carry out[1]. The SFA, covers the full details of the roles of the architect from feasibility study time to the handover of the completed project. As noted, the SFA is able to bring a formal agreement on the duties and roles which the architect will be able to assume from the beginning of a project to its end. At some point, the architect is treated as the designer by some parties such as a contractor[2]. Section 2.6 is able to differentiate the roles of the architect and those of the designer in a project[3]. Nevertheless, at some point, the architect will be tasked with specific roles while others he or she can perform and relieve the designer from undertaking them. JCT 05 is able to provide the different specific roles which the architect has to carry out in a project. The following are some of the key duties designated for the architect. determination of levels and providing the contractor with relevant working and dimensioned drawings for setting out. Providing the contractor with copies of instructions, drawings and or any further details which are key to enlighten or provide clarity to the Contractual Documents. reviewing, considering and granting the required time extensions to the contractor for the project at different stages. Reviewing possible extension of time, which should be within 12 weeks after the completion of the project. issuing of instruction in order to resolve and issues and also any other instructions to different parties in writing. Specifying any instructions according to clause 3.13 which have been challenged by the contractor[4]. Also, the architect issues instructions about the expenditure of provisional sums to the contractor as indicated in BoQ (3.16), instruction on what need to be done on materials such as fossils, antiquities and materials of interest found on site (3.23). issuing of the interim certificate and also the final certificate to the construction contractor, issuing of any certificate due to the employer and a duplicate to contractor which are under contract agreements as in 1.9. issuing of certificate of Making Good, at the time when the contractor has made good all defects in any part which he or she is responsible and when the contractor has made good alls the defects in the schedule of Defects. taking into account and addition or any deductions of the total contract sum when computing the preceding interim certificate for the contractor. offering instruction to the Quantity Surveyor in order for him or her to ascertain any loss or expense experienced due to disturbance of the progress of works, which results from discovery of fossils or other materials which will hinder work execution on site. instructing of ascertaining the Quantity Surveyor to put in record any loss or/and expense applied by the contractor. References Abdou, Alaa, Mohd Radaideh, and John Lewis. "Decision Support Systems and Their Application in Construction." 2010. Print. Ensom, Anthony C. "Adjudication on Jct 81 Contracts." Structural Survey. 16.3 (1998): 130-135. Print. John Uff, Construction Law, 12th Edition, Sweet Maxwell, London, 2017, chapter 4. MacRoberts, Solicitors, MacRoberts on Scottish Construction Contracts, 3rd Edition, John Wiley Sons Limited, 2015, chapter 1, especially pages 5-15; and see also chapter 4 (obligations of the employer), chapter 5 (obligations of the contractor), chapter 11 (position of sub-contractors).

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.